About SimpLee Scaffolding
Single Scaffolding
This method is by and large utilized for block stonework and is called the brick layer's framework. The single platform comprises of norms, records, putlogs and so on., that is parallel to the divider at a distance of around 1.2 m. The separation between the guidelines is approximately 2 to 2.5 m. Records interface the norms at vertical interim of 1.2 to 1.5 m.
In this sort of platform, a progression of vertical individuals made of bamboo or timber (called Standards), are solidly settled into the ground in succession parallel to the building divider. The separation in the middle of two gauges is by and large kept inside 2.4 to 3 m.
In the event that the stature of the framework is high, to keep up its steadiness, at times corner to corner individuals (named as Braces) are given. Props are across the corner to corner fitted with the benchmarks utilizing rope lashing.